+252 61 7745050
Airport Road, Mogadishu, Somalia.
info@dalkomsomalia.com
Fibre & Connectivity

The last mile is where most Somali networks stop

International capacity is not the constraint any more. Getting it the final few kilometres — into a neighbourhood, a campus, an estate, a town — is. That is civil works, permits, plant and maintenance, and it is the part nobody wants to own.

RingsAccess built onto protected metro topology, not spurs
4Submarine systems already behind the upstream
2003Building and maintaining plant in this market since
How a build runs

Three stages, and the one everybody underestimates

Stage one

Design

Survey, route selection, permits and a design that accounts for how the area will actually grow — rather than the cheapest line between two points, which is what gets dug up first.

Stage two

Build

Civil works, ducting, cable, splicing and termination. The visible part, the expensive part, and the part where an experienced crew is worth what it costs.

Stage three

Operate

The one people forget when they cost a build. Fibre gets cut, equipment ages, estates expand. A network without a maintenance answer is a capital expense with an expiry date.

Access network projects

Send us the area you want covered

Give us the footprint and the premises you expect to serve. We will tell you what our rings already reach, what would have to be built, roughly what that takes, and which of the three models actually suits you.